
Control Panel in preparation for Shock Testing |
Testing All equipment supplied by Whippendell Marine undergoes a rigorous inspection and testing regime to ensure that it fully meets the customers specified requirements. This will include testing and inspection during the production phase, followed by full electrical testing to meet the requirements of Def Stan 07-226 and finally functional testing. Whippendell Marine can also provide Factory Acceptance Testing in the presence of the customer and their client, as required and commissioning after the equipment has been installed. We also have a wealth of experience in arranging environmental testing, such as shock, vibration, climate and EMC testing, if needed. |
Commissioning Aviation Ground Power System |